Well, quite a bit of work has been done on the cottage. I have a great team on the site headed by Gavin Fortuin and his colleague Roland. The gables have been repaired a new room has been prepared inside for the toilet and the floor of the living room has been excavated in preparation for the earthen floor. I met Diane on site on Thursday. She has made and earthen floor before. In fact she has built a cob house along William Moffat drive in Port Elizabeth. You can see it here.


Water for the works is still a big problem.

In the meantime we have moved the cattle over the stream to the grazing on the road side of the property.
The grazing is good there, but I was concerned to have them close to the road not trusting that they would not want to wonder off. The have been very well behave though since I put them there on Wednesday. I just moved them to a new patch of pasture this morning.